PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Capital
Flexible PEX piping in Dasman delivers a reliable supply network for tower apartments and seafront villas. We run the tubes from the main water meter through walls and ceilings to every outlet and tap point. Each section is pressure-tested before fittings are installed. The job closes with a balanced-line record and maintenance log.
Dasman holds wide villas with marble floors and multiple bathrooms per storey, and tower apartments that rise twenty floors or higher. In a villa we start from the roof tank or ground meter and run PEX at the right diameter to every bathroom, kitchen sink and external washpoint. In towers the climb from ground level is tight because old copper pipes fill narrow riser spaces, so PEX saves room and cuts the noise when water flows through.
Dasman sits on the Arabian Gulf coast in Kuwait governorate, a luxury residential zone where villas and towers both need a high-pressure water network.
Before apartment handover, every tap is opened together and pressure and flow rate are measured on each branch to ensure equal distribution.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
PEX does not corrode from salt or dissolved minerals the way copper does. However, pipes must be protected from direct sunlight on balconies and roofs because ultraviolet rays weaken the plastic.
The number of runs depends on bathrooms, kitchens and outdoor taps; a four-bath villa typically needs four separate supply lines of 20 mm diameter or larger. We map the entire run before cutting and bury pipes under floors where they are protected.
