PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Hawalli
PEX plumbing in Hateen replaces sections of old metal pipe dating to the nineteen-fifties or sixties in this established Hawalli district's homes, using transition fittings that prevent harmful chemical reaction between old metal and modern plastic.
Hateen's older homes often still carry sections of galvanized steel pipe that gradually corrode from the inside over decades of use, and replacing them fully with PEX reduces the internal joints that tend to corrode first in this old pipework. Where the new pipe meets any remaining metal section that cannot be replaced immediately, we use an approved transition fitting that prevents rapid electrochemical corrosion between the two metals, and check that point's seal with extra care, since it is the most leak-prone spot in homes this age.
Hateen in Hawalli governorate is a district of older homes and villas built from the nineteen-fifties through sixties, with galvanized steel pipework.
The point where new PEX meets a remaining old metal section in Hateen needs a transition fitting to prevent electrochemical corrosion.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Not necessarily, the most damaged sections can be replaced first using transition fittings at the points meeting the temporarily remaining metal.
Because two different metals meeting without a proper transition fitting speeds electrochemical corrosion at that specific point, so we check it more carefully than the rest of the line.
