PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Capital
Flexible PEX in Mirqab carries water from the main line beneath the street to clothing shops, restaurants and clinics near the Grand Mosque. We run tubing horizontally under existing tiles, clear of foundations and load-bearing columns. Pressure testing and joint inspection precede handover. Documentation includes a map of all new pipe routes.
Mirqab is a mixed commercial zone of shops, clinics and small eateries built on narrow footings and dense tile and concrete floors. When replacing old water pipes, we must avoid subsurface electricity, drainage and gas lines. We measure carefully from walls and columns before cutting a new PEX route. Some shops are tiny, so we run slim vertical runs on exterior walls under metal covers.
Mirqab sits near the Central Market and Grand Mosque in Kuwait City, a heritage commercial zone of adjoining older buildings.
Every meter of new PEX route under the floor is scanned with a metal detector before backfill to avoid striking existing rebar.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
At least 15 cm must separate tubing from power cables. We insert wooden or rigid plastic spacers between them to prevent tube-to-wire friction if the building vibrates.
We leave spare connection points at the end of each PEX branch during initial installation. If you want a tap later, we attach a new run that slopes downward and terminate it with a short waste line.
