PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Ahmadi
Flexible PEX networks in Sabah Al-Ahmad City distribute hot and cold water from a central pump station to hundreds of residential units. Pipes extend through foundations and partition walls in every apartment and office. Pressure and flow are tested at multiple levels because of building height. Work finishes by documenting every connection point and handing network plans to management.
Sabah Al-Ahmad City is a modern urban development with residential towers, hotels and offices reaching 20 storeys or more. A central pump station at the city base feeds a main PEX network underground. From each main branch we split into individual lines for each building, then inside each tower we run vertical pipes from ground floor to roof. Tall buildings need mid-rise pressure regulators because the column weight adds extra pressure.
Sabah Al-Ahmad City sits in Ahmadi governorate as a recently planned coastal development project, with central infrastructure and tall buildings.
We install digital pressure gauges every tenth floor because the difference between ground and roof pressure can reach 6 bar.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We divide each riser into sections using pressure regulators and intermediate tanks on mid-level roofs. This maintains steady pressure and prevents pipe rupture at the top.
Yes, we do annual checks of pressure and flow from the central station and inspect main joints underground for leaks. Every five years we open drain valves and flush mineral deposits.
