PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Jahra
Flexible PEX in Taima overcomes the long distances between scattered houses and private wells. We run pipes from wells across the desert under soil to protect from sun and sand. We test the network at high pressure to verify no leaks over long runs. Each house gets its own separate inlet with an isolation valve.
Taima houses are scattered across desert fringes, and many families own private wells instead of relying on government supply. We identify the best route under the soil from the well, then lay half-inch PEX pipe in a trench at least 60cm deep to protect from thermal stress. The longest run from well to house can reach 500 metres, so we divide the route into sections and test each before connecting the next. At the line end we fit a mesh strainer to protect taps from sand and sediment.
Taima is a desert village in Jahra governorate where houses are scattered and private wells are more common than central water networks.
We test each well branch under continuous flow for a full hour to verify stable pressure over long distances.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We place the pipes inside thick-walled polyethylene protection sleeves in the trench. This completely separates PEX from soil, roots and burrowing animals and makes future maintenance easier.
Yes, but we need a check valve on each well line to prevent water from one well flowing back toward the other. We test these valves by pumping from each well separately.
