PEX pipe runs
Flexible concealed runs with the fewest cuts into finished walls

Ahmadi
Flexible PEX plumbing in Wafra Agricultural provides reliable water supply to farm buildings and agricultural operations from the main pump point. We run tubes across open land protected from sun and weather with black covers or guard pipes. The network is tested under full pressure before any irrigation or livestock equipment is connected.
Buildings in Wafra Agricultural area include poultry houses, storage sheds and monitoring stations that need separate water feeds. Flexible PEX allows water to run across sandy soil and rocky ground without deep trenches or complex support work. We install isolation valves at each building for quick water shutoff when needed, and mount pressure reducers near use points to protect internal lines from pump pressure spikes.
Wafra Agricultural is in Ahmadi governorate and comprises multiple farms and poultry facilities spread across wide areas.
Each network section is tested at 15 bar for two hours before activating long lines due to high agricultural pump pressure.
Flexible concealed runs with the fewest cuts into finished walls
Brass press fittings that need no flame or solvent cement
Run before walls close to confirm every joint is sound
One valve per circuit so any line can be shut independently
Set to prevent sludge build-up and recurring blockages
Tying the PEX network to every use point across the building
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Black PEX withstands long sun exposure, but we add UV-protective covers or bury pipes 30cm deep. This keeps tubing flexible and prevents surface cracks.
We install an air chamber and relief valve right at the pump outlet. This absorbs sudden pressure and protects tubing from burst or separation at connections.
