Operation and maintenance contract
Scheduled periodic visits with a written report after each one

Capital
Water and drainage maintenance in Shuwaikh Industrial handles heavy-gauge pipes, high pressures and large flows in warehouses and factories. We test pressure valves, check separators and pumps, verify drainage falls and extract sediment from catch tanks before shutdowns occur.
Large warehouses and logistics facilities in Shuwaikh Industrial depend on steady water flow and drainage that does not fail. Regular maintenance here requires checking main supply lines for pressure stress and cracks, cleaning grease separators every two months, and testing drainage pumps under full load.
Shuwaikh Industrial sits in Kuwait City within the main industrial zone, where high-load water warehouses and factories are concentrated.
We test the main pressure valve by injecting compressed air and measuring drop to detect early internal leaks.
Scheduled periodic visits with a written report after each one
Full coverage across all units in a building or residential complex
Checking water pressure, pumps, tanks and isolation valves throughout
Inspecting drain runs and catching partial blockages early
Periodic acoustic and visual checks for leaks behind walls or under tiles
Written record per visit showing condition, work done and recommendations
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We test the pump by running metered water under full pressure to measure flow and listen for abnormal sounds. We remove the sump plug to extract accumulated sediment from the pump chamber.
At least every two months if operations release grease daily. We remove the frozen fat layer from the top, scrape the bottom and flush the interior chamber with hot water.
