Position and height
Basin set at a practical height and checked level before any connection is made.

Ahmadi
Ablution basin installation at Ahmadi Stables begins by mapping the spread-out buildings around the track. We locate the nearest water point and floor trap, run the lines and verify level and fall precisely. We test flow at full pressure and seal every joint before handover.
Ahmadi Stables contains several separate buildings including stalls, training halls and rider rest areas, and the distances between buildings mean the waste pipe can run long. We check the natural ground fall to find where steady drainage will work, and if the floor trap is too high we locate an alternative outlet or raise the basin outlet. Long pipes need careful checking at each access point to prevent future blockage.
Ahmadi Stables sits in Ahmadi governorate around the racing track, serving multi-purpose equestrian facilities.
Before handover, the full waste line is tested with continuous water flow because long pipe runs need extra confirmation.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We calculate the available fall per metre of run and select pipe diameter that ensures steady flow. If the fall is slight, we use larger-diameter pipe or raise the basin outlet to compensate.
Yes, longer lines should have at least one annual inspection to confirm no sediment buildup occurs. We mark clear access points during installation to make inspection and cleaning straightforward.
