Drain and supply check
Outlet position and height confirmed before the unit is placed

Ahmadi
Bathtub installation at Ahmadi Stables begins with checking the floor outlet and its fall towards the soil stack. We level the tub on a stable base after measuring the floor, then connect cold and hot supplies and the waste line, finishing with sealed silicone around all edges.
Large homes near Ahmadi Stables have spacious bathrooms with raised floors, which means the waste outlet needs a long fall to reach the main sewer. We inspect the outlet height and distance from the tub position, then test the fall with cold water before starting. If the gradient is insufficient we raise the tub or add a sump pit downstairs.
Ahmadi Stables sits in Ahmadi governorate, a luxury villa zone near the horse racing track where master bathrooms are spacious and built to high standards.
Every fixture joint is pressure tested with full water flow for at least one hour to confirm no leaks develop.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Not always, but if the fall from the bathroom to the main sewer is less than one in a hundred we add a small sump pit with a pump to lift the water. This ensures fast drainage and prevents odours.
Yes, we wipe the inside and outside with dry cloth first to remove shipping dust and factory oil. This lets us apply silicone evenly and makes the seal stronger and longer-lasting.
