Position and height
Basin set at a practical height and checked level before any connection is made.

Ahmadi
Ablution basin installation in Eqaila starts by checking the floor space in a ground bathroom or beside the majlis. We position the basin near the existing floor trap, run supply lines and test all drainage before completion.
Most Eqaila houses were built with spacious ground bathrooms that have deep floor traps, giving us good working room without raising floor levels. We measure the existing trap and the natural fall, then set the basin height to keep water moving without pooling. If the basin sits far from the majlis side near Al Kout, we run the waste pipe with gradual bends to maintain steady descent.
Eqaila lies in Ahmadi governorate, an upscale residential zone of large family villas with spacious ground bathrooms that have good depth.
We run hot and cold water together for three minutes to check every joint for leaks before handing over.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but a long waste run needs steady fall under the floor. We cut a sloped channel and lay properly sized pipe with gradual bends to prevent deposits and blockages.
A wall-hung basin lets us adjust outlet height easily and makes floor cleaning simpler. A pedestal basin hides pipes but needs the trap very close to ensure proper fall.
