Drain and supply check
Outlet position and height confirmed before the unit is placed

Ahmadi
Bathtub installation in Eqaila starts by assessing the floor trap location and the height of the existing drain inlet. We set the tub to exact horizontal level, connect trap and pipes, then fill it to monitor for leaks before handover.
Apartment complexes near Eqaila Co-op have medium-sized bathrooms with sturdy ceramic tile floors and standard floor traps. The thick tile and solid concrete backing give us a stable surface to set the bathtub base without settlement or shifting. We focus on measuring the fall from the tub base to the trap and testing water flow speed before fitting final accessories.
Eqaila is in Ahmadi governorate near the Kout commercial zone, a residential area of apartments and small villas.
We confirm the drain line fall is at least three degrees, because level tile makes proper gradient essential to prevent stagnation.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We measure the distance from the wall to the trap and the current inlet height. If the spot is close enough we fit the tub directly, otherwise we raise the pipe or run a new line instead.
We drain and wipe the surface after an hour of filling, and the bathroom air dries the surrounding tile within a few hours. We confirm all joints are dry before allowing bathroom use.
