Position and height
Basin set at a practical height and checked level before any connection is made.

Hawalli
Ablution basin installation in Hawalli begins by locating the floor trap near Hawalli Co-op or the main entrance. We adjust basin height, connect water and waste, and run a full pressure test before finish.
Hawalli holds residential towers, older villas and multi-storey commercial blocks, with small mosques and religious centres scattered between them near Hawalli Co-op and health facilities. The subsurface network here is complex because construction happened over long periods, and some floor traps are old. We inspect trap depth and distance from the wall before choosing basin type, and may need to enlarge pipe diameter if the shared line serves other users.
Hawalli sits in Hawalli governorate and is known for markets and health facilities, where infrastructure is developed but interlinked.
We pump pipes at steady pressure for five minutes and record the gauge reading to confirm no joint is leaking.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the basin is inside a tower the shared line may be loaded from other floors. We pressure-test under high flow to ensure basin drainage does not back up or stall when other levels are in use.
Possible, but there must be a trap nearby under the balcony or within the courtyard. We run a waste line from the balcony to the trap with safe fall and test it before opening any walls or laying new tiles.
