Drain and supply check
Outlet position and height confirmed before the unit is placed

Hawalli
A bathtub in Hawalli is installed on a base we first inspect for surface level and bond strength. We connect supply and drain lines, seal edges and fill with water for testing.
Hawalli residential buildings have a particular character: medium-sized bathrooms with tile floors laid years ago. Before positioning the tub we remove old tiles from the spot, clean the base and check concrete strength. If concrete is weak we add a fresh bonding layer before the tub. Drains are usually close to the foundation, giving us flexibility in placement.
Hawalli is a governorate crowded with apartment buildings and close to the Kuwait Red Crescent Society, with major commercial strips.
We fill the new tub and leave water standing for one hour before draining to verify no leaks at joints.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Removing an old tub usually leaves a cavity or deterioration in tiles and base. We repair the surface with fresh concrete and adhesive, then install the new tub on sound footing.
We run a new drain line from the tub to the old drain, or adjust the route if possible. Every new pipe is pressure-tested before the floor is sealed.
