Position and height
Basin set at a practical height and checked level before any connection is made.

Ahmadi
Fitting an ablution basin in Maqwa requires checking the floor and confirming the main drain line is available and accessible. We install the basin on a stable base and connect hot and cold supply in rated pipes. We test drain and supply together under full flow before sealing any floor openings.
Maqwa has a mix of older and newer homes, many with horizontal waste pipes running under floors. This means we must be careful when opening routes to avoid cutting existing pipes. We use a metal detector before breaking to locate pipes and cables. If the floor trap is far from the desired location, we fit a small sump pump to handle accumulated water and push it to the main line.
Maqwa sits in Ahmadi governorate near KOC oil fields and is an area of mixed age and development.
Before finishing, we fill the basin with alternating hot and cold water to test mixer performance and drain under real-world conditions.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only if the floor trap sits higher than your desired basin position. We calculate the height difference first, and if it is significant we install a small auto-pump that activates when water pools.
We divert the new drain route around the existing pipe if possible, or raise the basin position slightly to clear it safely. All this is measured and planned before any breaking starts.
