Position and height
Basin set at a practical height and checked level before any connection is made.

Jahra
Ablution basin installation in Saad Al-Abdullah City starts by choosing a wall or raising the floor to receive the waste run. We measure comfortable sitting height, arrange hot and cold supplies, connect the waste and pressure-test every joint before finishing.
Most Saad Al-Abdullah homes are built on standardized foundations with uniform ceiling heights, meaning ablution basins usually fit in narrow passages between the majlis and bathroom. We choose the best wall for simple access and short waste runs, secure piping with stainless clamps, and seal every penetration to stop damp spreading in the wall.
Saad Al-Abdullah City is in Jahra governorate, a planned residential district of uniform house designs and regular street layouts.
Waste is tested by running water from the supply tap and watching it fall clear at the trap outlet.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the concrete floor is thick and sound, no reinforcement is needed. We anchor it with stainless bolts in the slab and raise it with plastic shims to the correct height.
We cut the hole slightly larger than the pipe diameter, slide the tube through and pack the gap with flexible waterproof sealant, then finish with moisture-resistant plaster.
