Drain and supply check
Outlet position and height confirmed before the unit is placed

Jahra
Bathtub installation in Saad Al-Abdullah City starts by checking the drain outlet under the floor and measuring the bathroom perimeter. We set the tub level on a stable base, connect the waste line, fill it with water and test for leaks before closing the walls.
Saad Al-Abdullah City houses are newly built with standard bathrooms and poured concrete floors. The drain outlet usually sits at mid-height on the back wall, which lets us run the waste pipe at a steady fall toward the main sump. We check the floor level first and position the tub opposite the outlet, then bed it on sand to hold the base absolutely level.
Saad Al-Abdullah City lies in Jahra governorate, a planned residential district with grid-pattern streets and standardised bathroom layouts.
After filling the tub completely we inspect the waste pipe and joints for any moisture on walls and floors.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We fill the tub with warm water to the brim and leave it full for an hour while monitoring pipes under the floor through the access point. Any wet spots mean we disconnect the joint, clean it, apply sealed grease and refill to retest.
In Saad Al-Abdullah the concrete floor is strong, but we lay sand under the tub base to spread weight evenly. This prevents local settlement and cracks around the tub rim after a year or two.
