Position and height
Basin set at a practical height and checked level before any connection is made.

Hawalli
Ablution basin installation in Salwa begins with checking existing pipework in the bathroom. We select a position based on the nearest floor trap and available fall. We run hot and cold supply lines, fit the basin level and test every joint before handover.
Most Salwa villas near Salwa Co-op are family homes with deep ground bathrooms and central floor traps. This depth gives us freedom in placing the basin because fall is readily available. We fit it at the entrance wall or beside the existing sink, and run the waste in insulated pipe that keeps a steady fall all the way.
Salwa in Hawalli governorate is a quiet residential area of detached villas where ground bathrooms have straightforward, reliable layouts.
We fill the basin with cold water first to detect any weakness in supply joints before connecting the hot line.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install it at the standard height of 75 centimeters from the floor, but can lower it to 60 centimeters if you prefer. We test the new height before finalizing the waste connection.
A long distance requires a longer waste pipe beneath the floor with continuous fall. We measure and calculate the gradient first, and if the run is too long we suggest a position closer to the trap.
