Frame and tray level
Frame and tray set perfectly flat so water drains fully

Hawalli
A shower cabin installation in Salwa begins by checking floor and wall level to ensure the frame sits square. We measure the space, locate the floor drain, secure the frame firmly, seal every joint against water ingress and test the waste before handover.
Salwa houses have spacious master bathrooms on the upper floor, and a fixed cabin there gives good containment. We check the base height to ensure it sits high enough above existing floor level, and if the floor slopes we lay a levelling screed before securing the frame. The floor drains near Salwa Co-op in this district are deep enough for standard waste pipes.
Salwa lies in Hawalli governorate near Mishref Park, a district of family homes with modern master bathrooms.
We run the drain at full flow for ten minutes after installation because new floor screeds absorb fine moisture.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we typically raise it 5 to 10 centimetres to ensure a clear fall toward the floor drain. With a new floor we lay cement screed, with an old one we cut a shallow recess around the drain outlet.
We apply water-stop tape along every seam where the cabin meets wall and floor. After fixing, gaps are filled with flexible antifungal silicone, then we spray water over all edges to confirm the seal holds.
