Position and height
Basin set at a practical height and checked level before any connection is made.

Capital
An ablution basin installation in Sawaber targets apartments in modern high-rise towers with unified drainage systems. We choose wall height for the basin, connect supply pipes from the nearest point, link waste to the horizontal floor trap and test pressure before departure.
Sawaber Residential Complex has modern high-rise towers built to uniform specifications with international standard piping. Each flat has one or two bathrooms with calibrated floor traps at fixed positions, and vertical pipes run inside reinforced concrete walls. We check the building blueprint or ask the management about trap position and vertical pipes before any tile cutting. Most Sawaber installations are wall-hung on sturdy steel brackets because the floor trap is often distant or sits at too low a level.
Sawaber sits in Kuwait governorate and houses massive residential complexes with modern towers near the city centre.
Basin connections are tested by gradually raising pressure and reading the gauge to verify no underground leakage.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Most Sawaber flats have one trap in the main bathroom near the toilet. If you want a separate ablution basin you may need a small lift pump to push water up to the vertical risers.
Yes, concrete walls are robust and accept steel brackets with double bolts and chemical anchors. We check wall thickness first and use long stone anchors to ensure secure fixing.
