Site and drain check
Measure the bay and confirm drain fall before moving the unit

Capital
Sawaber jacuzzis are typically installed in a tower apartment bathroom overlooking the city. We verify supply pipes can deliver balanced hot and cold pressure and connect waste to a vertical standpipe in the wall. We fill the jacuzzi carefully, testing the pump, jets and heater before final handover to the owner.
Modern Sawaber residential towers have standardized plumbing and central ventilation, but waste disposal is constrained and often shared between units. The jacuzzi requires careful handling: we ensure the connection to the vertical stack sits higher than regular bathroom waste discharge. We install a trap seal on the outlet to prevent backflow and odour from the main stack.
Sawaber sits in Kuwait governorate near the large housing complex and central residential towers, a densely built urban zone.
Before handover, we fill the jacuzzi half full, run the pump for five minutes and inspect every plumbing joint from under the bathroom for leaks.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the other unit has matching supply and waste points. We disconnect carefully and move the unit through interior corridors, then re-connect with new valves and fresh sealant before filling.
Modern pumps run at around 70 decibels, a low level. We mount it on isolated rubber pads and pressurize the internal air spaces to reduce vibration before operation.
