Position and height
Basin set at a practical height and checked level before any connection is made.

Capital
An ablution basin installation in Sharq usually happens in an office tower near NBK Head Office or Sharq Marina, where pumped water can reach the tap at higher pressure than a basin needs. We read the pressure first and add a reducing valve where the reading calls for it.
High pressure makes a low ablution spout spray across the floor and wears out cartridges early. We gauge the static pressure at the chosen point, and where it is high we fit a compact pressure-reducing valve on the branch, set for a comfortable flow. Commercial restrooms here are usually finished in large porcelain panels with a raised floor or a service riser behind them, so we route pipes through existing access panels rather than cutting new openings.
Sharq in the capital governorate holds office towers between Kuwait Towers, Sharq Marina and NBK Head Office.
Pressure at the basin branch is gauged before fitting, and a reducing valve is added when the reading is high.
Basin set at a practical height and checked level before any connection is made.
Trap and rubber seal fitted so waste drains fully with no odour return.
Braided flexible tails connected to isolation valves for future servicing.
Single-lever or separate taps set with PTFE tape and thread compound at every joint.
Non-fungal sanitary silicone applied along the full basin perimeter to keep moisture out.
Flow confirmed and every joint inspected for drips before the technician leaves.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Pumped systems in towers can deliver more pressure than a basin needs. A reducing valve on the branch brings the flow back to a gentle stream.
Usually yes. We isolate the washroom branch only, so the rest of the floor keeps water while we work.
