Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
Stone resin and cast iron tubs are a popular choice in the high-rise apartments near Sharq Marina, and bathtub installation in Sharq starts with the weight question. A filled heavy tub puts a concentrated load on the slab, so we confirm it with the building's engineer before delivery.
We give the building team the tub's filled weight and its footprint, and ask where the slab can take it. Sometimes the answer moves the tub a short distance toward a beam line, which also changes the waste route, so we plan both together. Delivery into a tower near the NBK Head Office uses the goods lift with a pallet jack and floor protection all the way from the loading bay to the bathroom.
Sharq is the capital's waterfront business district, home to Kuwait Towers, Sharq Marina and the NBK Head Office.
For heavy tubs in Sharq towers, the filled weight and footprint go to the building engineer before delivery.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Most can, but the building engineer should confirm it. A filled heavy tub concentrates its weight on a small area.
We adjust the layout and the waste route together, usually shifting the tub a short distance toward a stronger part of the slab.
