Drain and supply check
Outlet position and height confirmed before the unit is placed

Hawalli
A freestanding bathtub installation in a Bayan villa is planned from the floor up. In the master suites around Bayan Palace, the tub stands away from the walls, so its waste and taps have to rise through the floor at precisely the right spot.
With no wall to hide pipes, everything for a freestanding tub runs under the screed. We set the waste position from the tub's own template, add a floor-standing mixer supply with isolation valves reachable from an access point nearby, and lay a slight fall under the tub so any splash drains away. Once tiling is done, the tub is placed, the waste is connected from above, and the base is sealed discreetly.
Bayan is a quiet villa district in Hawalli governorate, known for Bayan Palace and the Bayan Co-op.
For Bayan freestanding tubs, the waste position is marked from the maker's template before the screed is poured.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Only partly. The waste has to come up under the tub, so a section of floor is opened, though wall tiles usually stay untouched.
Either on a floor-standing mixer beside the tub or on the wall behind it. Floor mixers look cleaner but must be planned before the screed.
