Drain and supply check
Outlet position and height confirmed before the unit is placed

Ahmadi
Bathtub installation in Julaiaa begins by checking the house foundation and confirming the main drain exists and sits low enough to take the bathtub outlet with a natural fall. We fix the bathtub perfectly level, secure every joint tight and test with live water for zero leaks.
Julaiaa southern houses are mostly built on reinforced concrete floors over deep sandy layers, which usually means the bathtub sits on a ground floor with drain access nearby. We inspect existing pipes before connecting, because old concrete may have cracks that leak sewer water into soil. We run fresh pipes from the bathtub to the main junction point, with a pressure test to ensure nothing leaks during use.
Julaiaa sits in Ahmadi governorate in a remote southern zone, where houses are spread out and thick concrete floors protect from shifting sand.
Before handover we plug the bathtub outlet, fill to the rim for an hour and check that no water leaks from the unit base or joints.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, if the main stack is wide enough and sits low enough. We check the existing line capacity and connect the bathtub directly to it without a separate run.
It may need a deep horizontal cut for a new waste line under the tiles. We find the best route that minimizes breakage and refill the opening with fresh concrete after testing the pipe.
