Drain and supply check
Outlet position and height confirmed before the unit is placed

Mubarak Al-Kabeer
Bathtub installation in Mubarak Al-Kabeer starts with checking the drain outlet and concrete floor for any slopes that affect water run. We position the unit, place a spirit level on it and adjust the feet until it sits perfectly flat. Then each drain joint is tested under high pressure before sealing and grouting.
Most apartment blocks in Mubarak Al-Kabeer near the Co-op have small bathrooms with older floors that may be uneven. This means a new bathtub may need a cement levelling pad under the feet to correct the slope and ensure water drains. We check the existing drain first and confirm whether it is blocked or clear, because any old blockage shows up right after filling the tub.
Mubarak Al-Kabeer lies in Mubarak Al-Kabeer governorate, a dense built-up area of residential blocks with older foundations that may not be level.
The tub is filled three hours after sealing and watched for ten minutes during full drain to confirm no leaks appear.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Not necessarily. If the existing drain is in a good spot, we set the tub on the current floor and use a cement pad under the feet if needed. We only break out old foundation if it is directly under the new unit location.
We wait at least three hours for the silicone and adhesive to set, then fill the tub and drain it empty without weight to confirm no leaks. Normal use can begin after that.
