Drain and supply check
Outlet position and height confirmed before the unit is placed

Capital
A bathtub installation in Rai begins by checking shared commercial drainage and ensuring the tub does not overload the system. We mount the tub on a strong steel base and test waste and overflow by running hot water for several minutes.
Rai is a commercial zone with shops, restaurants and hotels, and if the bathtub is in an office or rest space, the ground may be solid concrete or quartz tile. These surfaces do not allow digging a new trap, so we either connect the tub to existing drainage via a flexible pipe or raise the tub above level to reach a higher trap. We test every joint by alternating cold and hot water under changing pressure.
Rai lies in Kuwait City near The Avenues Mall and major retail zones, with shared central drainage.
We check shared drain pressure before installation because it may be heavily loaded from other units.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the floor is level and near an existing drain point. We verify that shared drainage can handle the extra tub water without raising pressure on neighbouring units.
Raising the tub to an upper floor increases pipe length but may reduce pressure at the main point. We calculate full fall from the upper floor to main drainage and recommend a separate line if possible.
