Drain and supply check
Outlet position and height confirmed before the unit is placed

Jahra
Bathtub installation in Subbiya requires understanding the fast floor drainage because the area sits near groundwater. We measure the waste fall precisely, bed the tub on a stable layer and fill it to test complete sealing before covering pipes with sand and tiles.
Subbiya buildings range from older villas on shallow foundations to newer homes with stronger construction. Bathroom floors here are often sealed with bitumen or thick mortar against groundwater seepage, so the bathtub waste must reach the sump with unbroken steady fall. We check the sump depth and run the pipe carefully away from bathroom walls to avoid leaks under the foundation.
Subbiya sits in Jahra governorate near Sheikh Jaber Al-Ahmad Causeway, an area exposed to groundwater level fluctuations.
We test the drain fall by measuring height difference along the waste pipe to ensure linear flow without pooling.
Outlet position and height confirmed before the unit is placed
Bath feet adjusted until all four sides read level
Waste and overflow set fitted with a proper sealed gasket
Hot and cold lines connected with isolation valves and braided hoses
Non-fungal sanitary silicone along the full bath-to-tile joint
Unit filled and drained to verify every joint before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we ensure the bathtub drain outlet sits above the groundwater level with a safe margin. If the outlet is low we raise the pipe route or suggest a small pump to push water toward an upper sump.
We fill the tub and leave it full for six hours while monitoring drain pipes from below. After that we drain it slowly and inspect joints and outlet for any leakage or unusual moisture.
