Site and drain check
Measure the bay and confirm drain fall before moving the unit

Ahmadi
A jacuzzi in Jaber Al-Ali starts by verifying the hot water source, whether an electric heater or the villa's central gas heater. We connect one-and-a-half-inch copper pipes, mount the pump at or below the tub waterline, and run a full pressure test.
Most Jaber Al-Ali villas are older and have a central heating system on the roof or ground floor. We trace the hot water line from the boiler to the jacuzzi room and test temperature before connecting, because the jacuzzi needs steady heat between 37 and 40 degrees Celsius. If the hot line is shared with the main bathroom, we fit a mixing valve to regulate temperature without affecting the other bathroom.
Jaber Al-Ali sits in Ahmadi governorate, known for classic villas with older central heating systems.
We test pressure balance between hot and cold lines by opening each tap alone then together to ensure hot pressure does not drop.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If the copper pipes are in good condition with no deposits or leaks, they can be used. But we pressure-test them first and add a rust filter if needed.
The mixing valve allows automatic balance, but if hot water demand exceeds heater output, pressure drops at all outlets. This requires adequate heater capacity or separate usage schedules.
