Site and drain check
Measure the bay and confirm drain fall before moving the unit

From site check and drain alignment to jet pump connections and final handover test
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
Call or WhatsApp us with the unit type and installation location
We measure the bay and check drain, supply lines and electrical point
Set the unit level and connect supply, drain and pump lines
Apply silicone to all edges and run a full water test for leaks
Inspect the unit with us before any wall or floor is closed
Applied along the full rim to stop water migrating under the unit
Holds enough water column to block sewer vapour from rising through jet inlets
Absorb minor alignment gaps between wall supply and unit inlets without stressing fixed joints
Used on every threaded joint to hold a seal under the jet pump's operating pressure
Have the jacuzzi dimensions and the available bay size ready before the visit
Note the floor drain opening position and its height relative to the finished tile
Confirm an electrician has prepared a dedicated earthed outlet for the jet pump beforehand
Know where the nearest water isolation valve is to speed shut-off when work begins








Part of Sanitary fixture installation · All services · Back to the home page
No fixed rate: the quote depends on factors specific to each unit and site
Multi-jet large units need more connections than a compact single-pump model
Old galvanised iron pipes may need partial replacement before the unit connects
Adjusting the drain outlet position means separate breaking and tile reinstatement costs
Upper floors or tight bays increase the labour time required
Customer supplying connectors, valves and sealant affects the total quote
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else’s home is not ours to be careless in.
Do not take our word for it. Look at the work yourself.
The leak is marked before a single tile comes up.
A leak does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Six governorates, 139 areas.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on where the existing drain outlet and supply lines sit. If the connections align with the unit, minimal breaking is needed. If the drain position must shift, targeted breaking is unavoidable.
The most common cause is a shallow trap that dries quickly or fails to hold enough water to block sewer vapour. Fitting a deep-seal trap sized to the unit outlet resolves the issue at source.
A jacuzzi runs its jets from an internal pump independent of building line pressure, so low mains pressure is not a direct barrier. The supply line must still be adequately sized to fill the basin in reasonable time.
Both share supply and drain connections, but a jacuzzi adds a jet pump requiring a dedicated earthed electrical point and extra leak checks on every joint exposed to pump pressure.
Yes, mineral deposits gradually narrow jet nozzles and reduce flow force. Periodic nozzle cleaning maintains pump performance and extends the unit's working life.