Site and drain check
Measure the bay and confirm drain fall before moving the unit

Capital
Jacuzzi installation in Qadisiya begins with checking the bathroom floor thickness and foundation. We run water lines from nearby points, connect drain and ventilation in the right location. Pressure, flow and leaks are tested before finish.
Qadisiya houses near Kuwait SC stadium have mid-sized bathrooms with mixed ceramic and marble floors. A heavy jacuzzi loads the narrow bathroom floor significantly. We check concrete thickness under tiles and support it with a balanced base if needed. The tub is fully drained to test its drain then we check for seepage under the floor.
Qadisiya sits near Kuwait SC stadium in Kuwait City, a district of dense residential houses set close together.
The tub-to-trap fall is tested with a water level because wrong slope causes moisture pooling under the floor.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we inspect the beams and concrete lintels under the tub. If the floor is thin we install a steel beam under the tub to spread weight across columns. Stability is tested before filling the tub.
Yes, compressed air from the pump needs an outlet to the roof to prevent pressure buildup. We run a PVC vent pipe with slight slope to roof level and test air discharge before completion.
