Site and drain check
Measure the bay and confirm drain fall before moving the unit

Capital
Jacuzzi installation in Yarmouk starts by checking the concrete foundation and existing water lines near the bathroom. We choose the tub position at a reasonable distance from supply and drain, connect the pump and nozzles and run a full pressure test before final handover.
Yarmouk houses have medium-sized bathrooms with strong foundations and relatively modern water lines. Drainage lines are usually standard and sub-floor, making installation easier than older bathrooms. We check first if there is enough space under the floor for additional drain pipes, and if we need to raise the floor slightly we do so carefully around adjacent bathrooms.
Yarmouk is in Kuwait governorate near Yarmouk Co-operative, a neighbourhood of medium-sized family houses where the main bathroom is the primary location for jacuzzi installation.
After full installation, the jets run at high pressure for thirty minutes while we monitor drainage and pressure to ensure stability.
Measure the bay and confirm drain fall before moving the unit
Set the unit level so water drains fully without pooling
Hot and cold lines connected with accessible isolation valves
Deep-seal trap sized to the unit outlet, preventing drain odour
Verify pump connection point and electrical outlet with the electrician
Sanitary silicone on all edges, full water test before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, pump and pipes are designed with pressure margin. But we need to open walls or floor around the tub and reconnect supply and drain. Full testing is required after any addition.
The tub itself needs no special protection, but we advise filling with treated water or adding a limescale reducer every two months. Jets and pump need regular cleaning to prevent blockage.
