Washbasin and wall-hung basin
Countertop or wall-hung, with supply lines and a sealed waste trap.

Jahra
Sanitary fixture installation in the new homes near New Jahra Co-op works best when the fixtures are chosen before plastering. Families who pick sanitary ware afterwards often find the pipe tails do not suit the basin, WC or shower they want.
A Jahra builder usually sets pipe tails at standard heights, but a wall-hung basin, a back-to-wall WC or a concealed thermostatic shower each need their own positions, and a wall-hung WC needs a carrier frame fitted before the wall is built up. When the family's choices reach us early, we mark every tail, waste and frame on the wall with the model's dimensions, check them before plastering, and hold the fixtures back until tiling is complete. The result is fixtures that sit flush, with no visible offsets or extensions.
Jahra (New), near Jahra Mall and Jahra Hospital in Jahra governorate, is a district of family homes being built and fitted out.
A wall-hung WC chosen after plastering may need walls reopened to fit the carrier frame it depends on.
Countertop or wall-hung, with supply lines and a sealed waste trap.
Wall or counter mount with correct waste outlet and supply valves.
Pan, cistern or in-wall frame, sealed base and flush line fitted correctly.
Tray, linear drain, riser and mixer connected and water-tested before tiling.
Set level, overflow solvent-welded, mixer and waste fully connected.
Supply, pump and jet lines connected with pressure test before finishing.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Before the walls are plastered. The chosen models set the pipe positions, and changing them afterwards means extensions or opening walls.
Often, by building a slim false wall to hold the frames and reposition the tails. We check the space and waste positions before you commit.
