Frame and tray level
Frame and tray set perfectly flat so water drains fully

Capital
Shower cabin installation in Khalidiya happens in family homes and flats around the park by extending existing drainage or creating new. We measure the space precisely and run drain pipes with even fall. We anchor the cabin frame with fix plugs and wait for silicone to cure before final testing.
Homes and flats near Khalidiya Park are mixed: some old, some new, with varying bathroom layouts and sizes. When we arrive we gently level the floor because older homes may have long dips. If the floor slopes steeply we lift the cabin side with small metal shims. We run drain pipes that slope steadily toward the trap and never back up. We apply silicone in dry conditions if possible because high humidity delays curing.
Khalidiya sits in Kuwait governorate near Khalidiya Co-op and Khalidiya Park.
We test drainage by opening the cabin door and spraying from the showerhead for a full minute because mixed-age homes may have slow drains.
Frame and tray set perfectly flat so water drains fully
Trap connected to waste line at the correct fall
Flexible supply lines connected to isolation valve and shower outlet
Sanitary silicone applied along every profile edge and corner
Door magnets and hinges adjusted so the panel closes firmly
Water run, drain checked, all edges inspected for leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
You may need drain cleaning first before cabin installation. We visit and test the drain with cold and hot water together before starting. If it is slow we suggest clearing it with a drain machine before we begin work.
Yes, if there is already a drain nearby. We measure the floor and walls and choose a cabin size that fits the available space. If needed we lift the cabin slightly on shims without excavating the floor.
