Waste outlet check
Height and position confirmed before the shower tray is set.

Farwaniya
Shower installation in Ardhiya Warehouses usually goes in a storage office or admin block. We fix the head at set height, run supply from the roof tank and connect waste to the main drainage channel with full testing.
Ardhiya Warehouses are open-plan buildings with high ceilings and wide concrete floors, with roof tanks supplying natural pressure. A shower in the staff room needs long supply runs from the tank with thermal wrap to keep warm water hot. Waste must slope toward the main drainage sump near warehouse gates and shared corridors.
Ardhiya Warehouses district in Farwaniya provides large storage spaces that need proper water facilities for staff.
Hot water temperature is measured after startup because long pipe runs cool water quickly.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Pressure depends on tank height above the shower head. If the difference is less than one and a half metres we install a small electric pump to boost pressure.
We install isolation valves on long runs for easy inspection and flushing. We recommend opening drain cocks every three months to check for sand deposits that collect in pipes.
