Waste outlet check
Height and position confirmed before the shower tray is set.

Capital
Secure shower installation in Yarmouk starts with bathroom dimensions and existing pipe inspection. We set the position, fit the unit, seal edges and test pressure and drainage before handover.
Yarmouk villas and flats have spacious bathrooms with stone or ceramic-faced walls. We check wall thickness before fitting to ensure it can bear the shower weight and water pressure. Bathroom floors here slope properly and traps sit close, so we choose a low position allowing natural drainage without a pump. Old supply lines may be copper or plastic, and we must inspect connections carefully before connecting the new shower.
Yarmouk is in Kuwait governorate near Yarmouk Co-op and Yarmouk Sports Club, an upmarket residential area with medium density.
We measure incoming pressure before and during shower flow because drops signal breaks or blockages in hidden lines.
Height and position confirmed before the shower tray is set.
Tray levelled and trap sealed with a rubber gasket.
Hot and cold lines connected to the mixer with isolation valves.
Mixer and arm fitted with thread sealant on every joint.
All tray-to-wall edges sealed with non-fungal sanitary silicone.
Water run and full drainage confirmed before handover.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we use heavy-duty expansion anchors made for stone instead of standard plugs. We test the mount by hand first before applying full water pressure.
We check using compressed air and listen for corroded debris rattling. If corrosion is severe we recommend replacing the lines to avoid later leaks and offer a separate quote for that.
