Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Hawalli
Wall-hung toilet installation in Bayan villas usually sits inside a master bathroom finished in marble or large porcelain slabs. Around the quiet streets behind Bayan Co-op, owners expect the flush plate and bowl to line up with the stone joints, and we set the frame with that finish in mind.
Large format stone leaves no room to shift a flush plate once the slabs are cut. Before the frame is locked, we mark the slab grid on the wall with the tiler and adjust the frame height and flush plate opening so both fall centred on a joint or on a slab. The bowl bolts are then cut to the exact stone thickness, so the pan sits tight without spacers showing.
Bayan is a villa district in Hawalli governorate, home to Bayan Palace and the Bayan Co-op shopping centre.
In Bayan, flush plate position is agreed with the tiler on site before the frame is fixed in place.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Both. We fix the frame before tiling, return to check alignment once the slab layout is marked, and hang the bowl after the grout has set.
Most designs work, provided the plate matches the brand of the concealed cistern. We confirm compatibility before the frame goes in so your chosen finish fits the opening.
