Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Ahmadi
A wall-hung toilet in Bnaidar begins by securing the frame to a strong concrete or reinforced-brick wall. We extend lines from the roof tank and main waste, then run full pressure test and inspect for leaks before use.
Desert houses in Bnaidar use thick concrete or enhanced-block brick to resist heat and strong winds, making them ideal for wall-hung anchoring. The roof tank supplies water via a line we draw through an insulated exterior wall. The yard floor trap is typically distant, so we run appropriately-sized waste with steady fall under sandy soil. We test waste flow continuously and supply under high pressure to ensure reliable operation.
Bnaidar is in eastern Ahmadi governorate, where remote desert zones require robust and independent drainage systems.
Before handover, the cistern and waste are run together for two minutes while we inspect every joint from start to trap.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The line passes through the thick wall, protected by foam insulation that minimizes heat loss. On very cold nights we advise running a slow trickle through the night to prevent freezing.
With steady fall and correct pipe diameter it can reach thirty metres. We calculate the fall precisely and test full flow over the complete distance after installation.
