Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Ahmadi
Wall-hung toilet installation in Shuaiba Industrial starts with bolting the steel frame firmly into the concrete walls of administrative buildings and facilities. We run supply and waste from the core, fit the cistern and pan, then pressure-test before handover.
Most administrative buildings and warehouses in Shuaiba Industrial are cast concrete with thick walls, making it straightforward to secure the frame with heavy anchors. We cut vertical channels in the wall for supply and waste pipes without disrupting the structure, and watch spacing between concrete columns. Waste falls steadily toward the main sewage collection point near the petrochemical plant site.
Shuaiba Industrial lies in Ahmadi governorate, an industrial zone forming part of the KIPIC petrochemical complex where office blocks and heavy-plant facilities dominate.
Each joint in the waste line is tested under live water pressure for ten minutes before walls are sealed.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we choose galvanised steel frames with anchors rated for the weight of six workers daily. Stability is tested before the cistern and pan are fitted.
We drill vertical channels with a locator that avoids embedded rebar, thread copper and plastic pipes through metal sleeves, then seal gaps with pressure-setting cement.
