Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Farwaniya
A wall-hung toilet in Dajeej is installed with care because the desert-fringe terrain has clay soil and heat swings affecting walls. We test the wall before anchoring, secure the frame with heavy fixing, and run waste and supply firmly before full testing.
Dajeej houses stand on foundations in clay soil that may settle or crack with moisture and heat swings, foundations deeper than other areas. Walls may split into fine cracks or shift slightly, so concrete testing with a probe drill is essential before anchoring. We choose expansion bolts at least 15 cm long reaching sound concrete beneath any surface cracks. Waste line drops at steady angle to a floor trap, and we test flow several times because slight wall movement may momentarily interrupt it.
Dajeej is in Farwaniya governorate, a desert-fringe zone with clay soil and deep building foundations.
We probe the wall before anchoring because slight soil settlement in clay can create cracks weakening the fixings.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Fine surface cracks do not weaken bolts if they are more than 5 mm deep. We probe to confirm sound concrete lies beneath, and we relocate a bolt if it pierces a deep crack, choosing a spot in thicker wall section instead.
After one year check waste pipes for slope change or sagging sections. Slight foundation movement can crack joints or reverse fall. Tighten any loose brackets and replace any pipe showing fine cracks before they worsen.
