Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Farwaniya
Wall-hung toilet installation in Ardhiya Industrial starts by assessing the concrete base and space underneath for runs. We anchor the frame securely into slab, extend waste and supply lines, hang the pan and cistern, then run a full-pressure test.
Large industrial buildings here contain employee bathrooms with solid concrete floors and high walls. In this setting, a wall-hung toilet makes cleaning under the seat easier and checking waste lines simpler. We measure wall-to-waste before frame anchoring because cistern depths vary, and we coordinate with builders where metal ties or electrical conduit blocks the slab underneath.
Ardhiya Industrial sits in Farwaniya governorate, an area of factories and storage facilities where bathrooms are standardized and floorplans are open.
After full installation, all cistern and waste connections are tested under steady pressure for one minute to confirm tightness.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
If existing lines are close to the chosen spot, we use them and connect the frame directly. In large factories, pipes typically run at consistent heights in walls, so we measure and coordinate to avoid cutting.
We tap-test the wall before drilling to find a stronger point. If needed, we fit a wider flange around the opening to spread load, which increases stability.
