Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Ahmadi
Wall-hung toilet installation in Fintas begins with checking the bathroom wall strength to carry the frame and load. We anchor the steel frame solid into the masonry, run supply and waste lines, set the cistern and test full pressure before handover.
Most flats and villas in Fintas near Fintas Co-op are built on coastal fill, with walls of concrete block or reinforced concrete that anchor the frame solidly. We tap the wall to check thickness and pick proper fixings, making sure not to cut into electric or water runs hidden behind tile. The waste drops with steady fall toward the nearest vertical stack, and the cistern sits high enough on the wall to give adequate water pressure.
Fintas lies in Ahmadi governorate near the coast with stable residential development, so internal waste stacks are well defined and accessible.
After joining each connection, we flush the cistern three times in succession to check frame bolt tightness and seal integrity.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the wall is concrete block or reinforced concrete 20 cm thick or more. We tap-test first and choose anchors that go right through to the rear face.
We run new waste pipe from the toilet to the nearest vertical stack with steady fall. If we cannot get fall under the floor, we may raise the wall-supporting the frame slightly to gain height.
