Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Ahmadi
Wall-hung toilet installation in Fahad Al-Ahmad starts with checking the bathroom back wall and confirming the structure is solid enough for frame anchoring. We run supply and waste inside the wall, set the anchored frame, mount the toilet bowl and cistern, then test under pressure.
Fahad Al-Ahmad homes are relatively new with solid concrete bathroom walls suited to deep frame fixing. We set the frame height for comfortable bowl positioning and run waste from the frame to the nearby floor trap with steady fall. We connect the cold supply to the network source and position the cistern for easy future cleaning and maintenance access.
Fahad Al-Ahmad sits in Ahmadi governorate, a sprawl of modern family homes with uniform design and standardised bathroom layouts.
Frame and bowl fixture are tested under high-pressure water flow for one minute before handover to confirm every joint is watertight.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, we use only thick interior walls because external walls are exposed to moisture and temperature swings. If the bathroom has only outer walls, we recommend building a new stud wall behind the toilet for proper frame support.
Usually three to four hours if base supply and waste lines exist. If we must run new pipes under floor tiles it takes a full day including grouting afterwards.