Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Capital
Wall-hung toilet installation in Gharnata in the outer suburbs requires first understanding wall and foundation structure. We anchor the frame to concrete block walls, run supply and waste from existing sources or new points, fit the cistern and bowl, then pressure-test.
Houses in outer Gharnata are built of thick concrete blocks and pipes usually run on the surface or in simple chases. Walls here are strong enough for the frame without issues, but existing lines may be far from the new bathroom. We check main water entry and waste points and extend from there, and if distant we cut a reasonable path under the floor or on external walls.
Gharnata is in Kuwait governorate in the outer suburbs where concrete blocks are the main structural element.
Because concrete block walls are strong, we use steel bolts rather than nails for the final frame anchoring.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Easier. Concrete blocks provide very strong frame anchorage and do not need additional timber studs. The only difficulty is that drilling through blocks takes slightly longer.
We run new pipe runs from the nearest points, either under the floor or on external walls. This adds time, but ensures correct waste fall and adequate supply pressure.
