Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Capital
Wall-hung toilet installation in Dasma starts with checking the concrete wall strength and bolting the steel frame absolutely tight. We run cold and hot supply plus waste behind the wall, then set the cistern and seat and pressure-test the whole system before leaving.
Most Dasma apartment blocks are older construction with brick and concrete walls thick enough to carry the toilet frame. We choose a position between concrete columns because the frame needs solid fixing so it does not rock in use. The waste pipe drops behind the wall and connects to the main soil stack or meets an existing horizontal line under the floor with steady fall.
Dasma sits near Kuwait City centre, a district of older family apartments where bathrooms are compact and walls are shared between units.
Every joint in the frame and cistern is tested under full water pressure for one minute before handover.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if the wall is concrete or brick at least 20 centimetres thick with no deep cracks. We check it first then bolt the frame with heavy steel anchors in holes drilled to full depth.
We drill carefully and wrap the pipe with a flexible waterproof seal in the gap. Then we plaster the wall over the hidden line and run full drain flow to confirm no leaks appear.
