Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Jahra
Wall-hung toilet installation in old Jahra encounters old stone houses and walls of uneven thickness. We test wall strength first, then fix the frame with deep anchors and carefully route waste and supply.
Houses in old Jahra near the ancient market are built from stone and brick with thickness varying by location. Before drilling we scan to identify solid stone sections and hollow voids. The waste line may need a sharp bend to skirt old water pipes already in the walls.
Old Jahra in Jahra governorate is a historic quarter around Al Jahra Fort and the traditional market.
Waste pipes in old houses are tested at slow flow first before full pressure to avoid damaging aged drains.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We tap the stone lightly first to gauge its strength. If it is weak we use epoxy anchors that fill cracks and set solid inside the stone rather than dry fasteners.
We use metal and utility detectors to locate old copper and iron pipes. If we find one nearby we shift the frame position or route the new waste line safely around it.
