Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Jahra
Wall-hung toilet installation in Qasr begins by measuring wall distance in rooms with relatively low ceilings. We position the frame at correct height, run fresh waste pipe, set the cistern and pressure-test before closing the wall.
Qasr houses are relatively older builds with low ceilings and narrow bathrooms, which means a wall-hung toilet gives better airflow than a floor pan. We mount the frame at specific height from floor to let users sit comfortably without their head rising toward the ceiling. The toilet waste slopes at a steady angle toward the sewer junction or adjacent line, and we cannot lift the pipe higher than needed because the fall might become too shallow.
Qasr sits in Jahra governorate, an older residential district where wall opening needs careful planning before cutting through masonry.
We test the waste pipe fall with a spirit level to ensure every metre drops between half a centimetre and one centimetre only.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, the cistern goes inside the wall directly above the toilet, not above the user's head. We check the wall thickness, remove some tile area and install a slim cistern that needs very little cavity depth.
We measure forty-nine centimetres from floor to the centre of the frame's top fasteners. This sets the seat pan at forty-two centimetres height, which is safe standard even with low ceilings.
