Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Hawalli
Wall-hung toilet installation in Nuqra starts with assessing the apartment wall and distance from main drainage stacks. We run lines with precise fall, bolt the frame heavy, and test under full pressure.
Nuqra apartment buildings have tight bathrooms and varied flat sizes, with main pipes running in service ducts between units. We measure from the drainage stack and check if the fall allows a direct run or if we need a longer line under the floor. Where distance is great, we raise the frame slightly to keep a steady 1 centimetre fall per metre.
Nuqra is in Hawalli governorate near Salmiya, an apartment district with pipes hidden in service stacks.
All supply and waste lines are flushed with pressurised water before handover to ensure no debris remains from installation.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if drainage pipes already exist in the wall. We examine the wall closely and trace the old pipe. If distance is short, we reach it directly without any floor excavation.
We raise or lower the frame slightly to correct the fall. If the gap is large, we use a longer pipe that rises gradually toward the frame. Steady fall stops water pooling and sediment buildup.
