Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Farwaniya
A wall-hung toilet installation in Sabah Al-Nasser starts with anchoring a frame near the Sixth Ring Road, then running waste and supply lines. We pressure-test every joint before handing over the work.
Sabah Al-Nasser homes are modern with spacious bathrooms but close to the Sixth Ring Road, which means vibrations stress flexible pipes. We choose solid metal pipes instead of plastic to withstand movement, and clamp them securely to the frame. If the waste run is long, we use double-wall metal tubing to absorb road vibration instead of single pipe that rattles.
Sabah Al-Nasser lies in Farwaniya beside the Sixth Ring Road, a modern residential district with strong concrete foundations.
We check pipe vibration after installation by placing your hand on the metal during drainage flow, adding extra clamps if we feel unusual rattling.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Possible but risky. Constant vibrations weaken plastic joints over years. We suggest metal for main runs and plastic only for short final branches with heavy clamps.
Yes, and flexible pipes rattle against walls. We use solid metal and foam insulators around pipes to reduce noise transfer to structure.
