Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Jahra
Wall-hung toilet installation in Sulaibiya Industrial mounts in working buildings with thick concrete walls and strong foundations. We bolt the frame securely to structural columns, run water and waste lines easily through concrete floors, and pressure-test every joint before handover.
Industrial buildings in Sulaibiya Industrial have reinforced concrete walls and thick strong floors designed to carry heavy loads, meaning we can bolt the frame completely safely without worrying about structural weakness. Most buildings connect to the public sewer or have a central site drain tank. We locate existing pipes and avoid ventilation ducts and cables before drilling.
Sulaibiya Industrial sits in Jahra governorate, a manufacturing and production area where all buildings are reinforced concrete designed for heavy duty work.
We test the bolts with load equivalent to three people before handover because industrial building use is intensive.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we need a small grinder pump if the toilet is higher than main waste line or more than five metres away. We select a pump sized for the load and frequent building usage.
We use high-strength bolts with lock washers to prevent loosening and tighten each bolt to exact torque with a torque wrench. We recheck tightness after a week of heavy operations starting.
