Concealed frame fitting
Steel carrier frame anchored at the specified height inside the wall

Jahra
A wall-hung toilet in Jahra Industrial serves a factory or workshop with demanding operational needs. We fix the frame to metal or light concrete walls, extend robust metal lines and measure final pressure accurately.
Factory walls in Jahra Industrial are metal or lightweight concrete with high humidity. Frame fixing requires special metal anchors that pierce the wall and bear toilet weight plus heavy use. Supply and waste pipes are copper or galvanised steel resistant to airborne moisture and chemical vapour.
Jahra Industrial in Jahra governorate is a zone of large metal factories and heavy workshops.
Every metal joint is fitted with rubber isolators to dampen vibration through the factory structure.
Steel carrier frame anchored at the specified height inside the wall
Waste pipe set at the correct fall to prevent backflow and odour
Supply line connected with an accessible isolation valve behind the service panel
Flush volume and fill valve pressure adjusted to stop continuous water loss
Bowl hung on frame studs with correct bolts and seat fitted firmly
Full leak check before wall is closed and again after cladding is in place
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We select a heavy-duty industrial frame with a 9-litre cistern capacity. We adjust the float for refill in 15 seconds even under repeated use.
We use red copper or heavily galvanised steel with isolating sleeves around fasteners. Each joint is tested for pressure and flow before handover.
